国产亚洲日本欧美韩国_日本三级免费2020_西西人体www大胆高清_久天堂视频中文字幕_人妻中字aⅴ电影_成年美女在线观看免费视频_特级日韩Av电影_亚洲1区2区视频在线观看_痉挛高潮喷水?V无码免费)_热门韩剧曰本一级毛片

News

News

Home| News| News

Hengtong have successfully completed the installation of the latest-model large capacity WTGs of Bozhong-A 501MW Offshore Wind Farm

2022-9-15 6477 Font size:

Hengtong has installed the first wind turbine of the Bozhong Off-shore Wind Farm’s Site A project, setting a new milestone after last year’s record of installing 12 deep sea wind turbines within one month. It is estimated that the Site A project, which scales 60 sets of H220-8350 wind power generators with a capacity of 501 MW, will provide 1.698 billion kWh green power every year, saving some 519,800 tons of coal equivalent and cutting 1,257,700 or so tons of CO2 emissions.


Utilizing our strong installation competence, qualified solution and professional crew, Hengtong provides comprehensive services for offshore wind power globally; and higher capabilities are soon expected to be added.


Hengtong never stops greening the world with its expertise.

 

1663202330933.jpg