国产亚洲日本欧美韩国_日本三级免费2020_西西人体www大胆高清_久天堂视频中文字幕_人妻中字aⅴ电影_成年美女在线观看免费视频_特级日韩Av电影_亚洲1区2区视频在线观看_痉挛高潮喷水?V无码免费)_热门韩剧曰本一级毛片

News

News

Home| News| News

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-7-22 6398 Font size:

Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.

In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.


6ce26866113e5e61e5841209cad8067.png